Hoppa till innehåll
Free shipping on orders over 3000 SEK excl. VAT! Volume discount: 5 pcs 2% · 10 pcs 3% · 25 pcs 5%
Volume discount: 5 pcs 2% · 10 pcs 3% · 25 pcs 5%The temperature was right when the load was loaded, but what happened during transport?With a 0.4-second temperature reading, you can measure accurately before the product has had time to changeCore temperature is what counts: how to document cooling and heating processes without handwritten listsThe cold chain failed overnight, but nobody can prove when or for how longUsing the Same Thermometer for Raw and Cooked Meat Is a Risk That Two Colors RemoveFrom ”it looks like a crack” to a measured and documented dimension on screenAntifreeze protection in the cooling system can look right and still be wrong: how to measure glycol content and freezing point in secondsHow to know that the glycol in your cooling circuit actually protects against frostTemperature and humidity in the warehouse can be monitored without anyone going there to take readingsStale air in the meeting room is a measurable number, and the dew point decides whether a surface stays glossy or turns mistyVolume discount: 5 pcs 2% · 10 pcs 3% · 25 pcs 5%The temperature was right when the load was loaded, but what happened during transport?With a 0.4-second temperature reading, you can measure accurately before the product has had time to changeCore temperature is what counts: how to document cooling and heating processes without handwritten listsThe cold chain failed overnight, but nobody can prove when or for how longUsing the Same Thermometer for Raw and Cooked Meat Is a Risk That Two Colors RemoveFrom ”it looks like a crack” to a measured and documented dimension on screenAntifreeze protection in the cooling system can look right and still be wrong: how to measure glycol content and freezing point in secondsHow to know that the glycol in your cooling circuit actually protects against frostTemperature and humidity in the warehouse can be monitored without anyone going there to take readingsStale air in the meeting room is a measurable number, and the dew point decides whether a surface stays glossy or turns misty
Item number 53-AN200-NIST

Anemometer with IR thermometer, with traceable calibration certificate

9.079 SEK

In stock

Anemometer, CFM, with traceable calibration certificate

Request a quote 53-AN200-NIST

Volume discount: 5 pcs: 2% · 10 pcs: 3% · 25 pcs: 5%

  • Free shipping on orders over 3000 SEK excl. VAT
  • Measuring instruments and gauges for professionals
  • Call us +46 8 753 00 04

Category: ,

Description
  • Anemometer with built-in non-contact IR thermometer measures surface temperatures up to 260 °C with a Distance:Spot ratio of 8:1, featuring a laser pointer to identify the measurement target
  • Simultaneous display of air flow or air velocity along with ambient temperature
  • Easy to set the measurement range; cm 2 values are stored in the meter’s internal memory for the next measurement
  • Resolution down to 0.01 m/s
  • 20-point averaging for air flow
  • Large (9999 Count) LCD display, backlit
  • 3% accuracy in air velocity measurement thanks to a low-friction 72mm ball-bearing impeller with a 120cm connection cable
  • Complete with impeller sensor with 120cm cable, 9V battery, and protective rubber case
  • Lead time is 5 weeks for a NIST certificate
Specification
  • Anemometer with built-in non-contact IR thermometer measures surface temperatures up to 260 °C with a Distance:Spot ratio of 8:1, featuring a laser pointer to identify the measurement target
  • Simultaneous display of air flow or air velocity along with ambient temperature
  • Easy to set the measurement range; cm 2 values are stored in the meter’s internal memory for the next measurement
  • Resolution down to 0.01 m/s
  • 20-point averaging for air flow
  • Large (9999 Count) LCD display, backlit
  • 3% accuracy in air velocity measurement thanks to a low-friction 72mm ball-bearing impeller with a 120cm connection cable
  • Complete with impeller sensor with 120cm cable, 9V battery, and protective rubber case
  • Lead time is 5 weeks for a NIST certificate
PDF (7)
Reviews (0)

There are no reviews yet.

Be the first to review

Your e-mail address is not published.

Your rating *